KEYMAX GROUP

KMM

MK SHIPMANAGEMENT

MEC

















EMS

« BACK   1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9   NEXT »


COMPREHENSIVE IMPLEMENTATION

A few examples of Implementation, of our Environmental Management System:
  • An inventory of all flexible hoses on board. This does not allow unregulated usage, thus proving difficult to make illegal connections, and in turn, precludes the vessel from being fined.

  • Ship specific sealing program of all flanges on susceptible pipelines where illegal connections may be possible, identified on a specially made ship-specific pipeline diagram. Again, beneficial to owners, as making of illegal connection is prevented, and in turn, huge fines are avoided.

  • Easy identification of areas around Emergency valves and direct bilge suctions. This prevents a ship staff from negligently opening these valves, and erroneously causing pollution overboard. This simple step saves the ship-owner a lot of money in fines.

  • Various Special Fittings on very crucial Pollution Monitoring Equipment and Pollution Prevention Equipment are being used throughout our fleet. To name a few simple ones, lockable valves, coloured plastic chains, stainless steel seals, etc., etc. These also, in their own way, prevent illegal discharges being conducted and subsequent fines from being imposed.




Page Top

« BACK   1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9   NEXT »









(C)Copyright 2000-2006 KEYMAX GROUP. All rights reserved.

Site Map

Contact us

Japanese Site